Foundation Park, Office Block - Maidenhead, Berkshire.

  • Writer: Snashall Steel Ltd
    Snashall Steel Ltd
  • Jan 20
  • 1 min read

Updated: Apr 3



Project: Foundation Park

Client: Volker Fitzpatrick

Tonnage: 437 Tonnes

Location: Maidenhead


The £13.5 million Building 1 development will offer approximately 5,000 sqm of office space across its three floors on completion.


The building will feature open workspaces, a full-height atrium with an internal staircase and a rooftop terrace.


The steel structures include custom cell beams with fabricated openings to accommodate the building's services. The beams to support the metal deck to create a composite floor solution for the upper two floors and roof. Specialist Ancon architectural bracings were installed in the glass facades to maintain a smart aesthetic specification throughout the structure.


Four 14m long trusses span the roof of the atrium area and support skylights above. At the front of the building, there's a large overhang which is supported by a pair of tubular Y-shaped columns.


The installation of the Y columns required SSF to use two cranes.


The feature columns were temporarily bolted on install, later to be site welded to conclude a seamless finish.


Close coordination was required when designing the feature columns to ensure they complied with the architectural make-up.


A collaborated effort with all parties allowed said connections to be finalised to comply with the client and consultant's final requirements to create a concealed finish.




Snashall Steel

Pulham Business Park

Pulham,

Dorchester,

Dorset

DT27DX


Contact

Phone: 01300 345588

Snashall Steel Commercial and industrial steel fabrication projects Call: 01300 345588 Email: info@snashallsteel.co.uk www.snashallsteel.co.uk


Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page